国产欧美一区二区三区鸳鸯浴,台湾sPa毛片,天天躁日日躁狠狠躁欧美av,玖玖在线综合网96

當(dāng)前位置:首頁-新聞資訊

施工時將鋁卷與外墻保溫板結(jié)合使用的優(yōu)勢

來源:http://www.igugo.cn/ 發(fā)布時間:2023-01-31

傳統(tǒng)的外墻保溫施工方法有穿墻螺絲和木方兩種,在保溫板上開穿墻螺絲孔,容易損壞鋁卷,后期還需要進(jìn)行封堵,大大提高了施工成本,也可以采用穿墻螺釘、木方、背楞相結(jié)合的方式進(jìn)行加固施工,施工過程繁瑣,在墻體中間放置水泥支撐條,以保證墻體的截面尺寸,而穿墻螺釘加固的背楞可根據(jù)工人施工經(jīng)驗(yàn)的熟練程度進(jìn)行調(diào)整,施工難度越大,質(zhì)量就越難保證。
There are two traditional construction methods for external wall insulation: through-wall screws and wooden battens. Opening through-wall screw holes on the insulation board is easy to damage the aluminum coil, and later plugging is also required, which greatly increases the construction cost. Also, the combination of through-wall screws, wooden battens, and back ribs can be used for reinforcement construction. The construction process is cumbersome, and the cement support strip is placed in the middle of the wall to ensure the section size of the wall, The back ridge reinforced by through-wall screws can be adjusted according to the proficiency of the workers' construction experience. The more difficult the construction is, the more difficult it is to ensure the quality.


冬季的外墻保溫裝置一般包括外墻模板、位于外墻模板一側(cè)的保溫板和多個緊固裝置,外墻模板包括平行于保溫板的模板體和從模板體向遠(yuǎn)離保溫板的方向延伸的多個側(cè)板。但是外墻保溫板在使用時是有缺陷的,一是保溫板間的連接不緊密,二是外保溫板不易更換。鋁卷生產(chǎn)廠家提醒,為了解決這一問題,現(xiàn)在采用的是鋁卷與外墻保溫板相結(jié)合的保溫方式。
The external wall thermal insulation device in winter generally includes the external wall template, the thermal insulation board on one side of the external wall template and multiple fastening devices. The external wall template includes the template body parallel to the thermal insulation board and multiple side plates extending from the template body to the direction away from the thermal insulation board. However, there are defects in the use of the external insulation board. First, the connection between the insulation boards is not tight, and second, the external insulation board is not easy to replace. The aluminum coil manufacturer reminded that in order to solve this problem, the thermal insulation method combining the aluminum coil with the external wall thermal insulation board is now adopted.
鋁材與外墻保溫板相結(jié)合的施工結(jié)構(gòu),主要包括保溫板、鋼筋混凝土現(xiàn)澆結(jié)構(gòu)、鋁模內(nèi)墻板、方管夾具、方管背邊和一次性拉片。
The construction structure combining aluminum material and external wall insulation board mainly includes insulation board, reinforced concrete cast-in-place structure, aluminum mold inner wall panel, square tube clamp, square tube back edge and disposable tab.
鋼筋混凝土現(xiàn)澆結(jié)構(gòu)的內(nèi)外側(cè)分別設(shè)有鋁模內(nèi)墻板和保溫板,保溫板的外側(cè)還設(shè)有固定保溫板的鋼架,一次性拉片的兩端穿過鋁模內(nèi)墻板和保溫板固定鋼架,一次性拉片的兩端與方管夾具連接,使得方管夾具相互對拉時,鋁卷和鋁模內(nèi)墻板鎖定在鋼筋混凝土現(xiàn)澆結(jié)構(gòu)的兩側(cè)。
The inner and outer sides of the reinforced concrete cast-in-place structure are respectively equipped with aluminum mold inner wall panels and thermal insulation panels, and the outer side of the thermal insulation panel is also equipped with a steel frame for fixing the thermal insulation panel. The two ends of the one-time pull tab pass through the inner wall panels of the aluminum mold and the thermal insulation panel to fix the steel frame. The two ends of the one-time pull tab are connected with the square tube clamps, so that when the square tube clamps are pulled against each other, the aluminum coil and the aluminum mold inner wall panels are locked on both sides of the reinforced concrete cast-in-place structure.
鋁模內(nèi)墻板上方設(shè)有豎向的樓板模板,樓板模板與鋁模內(nèi)墻板通過樓板轉(zhuǎn)角槽連接;鋁模內(nèi)墻板的底部還鉸接有墻板撐桿,墻板撐桿的另一端固定在地面上;保溫板的高度超過其所在樓層高度50mm。
A vertical floor template is set above the aluminum mold inner wall panel, and the floor template is connected with the aluminum mold inner wall panel through the floor corner slot; The bottom of the wallboard in the aluminum mold is also hinged with a wallboard brace, and the other end of the wallboard brace is fixed on the ground; The height of the insulation board is 50mm higher than the height of its floor.
雙拉結(jié)構(gòu)可以實(shí)現(xiàn)鋁卷的鎖定,安裝更加方便,對工人施工經(jīng)驗(yàn)的依賴非常低。一次性雙拉片根據(jù)壁厚尺寸定制,不需要水泥支撐條,減少了工序和成本。施工完成后,上下輕敲即可取下,不留大孔,無需后期堵孔作業(yè)。您對此有怎樣的疑惑就來我們網(wǎng)站http://www.igugo.cn咨詢吧!
Double-pull structure can realize the locking of aluminum coil, which is more convenient to install, and has very low dependence on the construction experience of workers. The disposable double pull piece is customized according to the wall thickness and does not need cement support strip, which reduces the process and cost. After the completion of the construction, it can be removed by tapping up and down, without leaving large holes, and there is no need for later plugging operations. If you have any doubts about this, please come to our website http://www.igugo.cn Ask!